WhatsApp

Wechat

Home Page >> Main Products >>Gold Mining Machinery >>Trommel Wash Plant >> Trommel screen for alluvial gold mining
Product Detail

Trommel screen for alluvial gold mining

No price
Please WhatsApp Us
008617667178895
Collect
BRIEF INTRODUCTION

Advantages:

*High throughput: 

*Proven gold recovery rates exceeding 97%

*Trommel easily movable on-site

*Built with longevity in mind

*Works well in remote locations

*Requires minimum persons to operate

*Low operating and maintenance costs

Process Flow:

Using excavator or loader feed the material to hopper, the hopper is equipped with pressure water system, then the material is evenly flowed into the trommel for washing&sieving. There are two high-pressure water pipes in the trommel screen to increase the washing and sieving efficiency. Smaller than 6mm material and water flow into the sluice box, total 2 sets sluice for two side, both with gold rubber mat inside. The material distributor divided the material into two sluice box evenly for gold recovery. The tailing are transported by the belt conveyor.

At the end of the day, just need to take off the rubber mat and wash it, you will get the gold with a little sand.



BRIEF SPECIFICATION

NO

Item

STGM1200

TGM1200

TGM1800


Capacity

Around 75m³/hr

Around 120m³/hr

Around 180m³/hr

1

Overall Length

8m

14.5m

21.5m

2

Overall Width

5.4m

8.4m

11m

3

Overall Height

2.8m

5.8m

5.1m

4

Valid Screen Area

7.5 m²

16.2 m²

28 m²

5

Trommel Inner Dia.

φ1200mm

 

φ1800mm

6

Sluice Box Area

4.5 m²

8 m²

14.4 m²

7

Recovery Method

High tech new designed grass with riffles

8

Mesh Size

8/10/12mmOptional

9

Feeding Hopper

6mm Steel Plate10mm Reinforced Rebar

6mm Steel Plate15mm Reinforced Rebar6mm Rubber Liner

10

Conveyor Power

Non

3kw-4p

7.5kw-4p

11

Trommel Power

7.5kw-4p

 

7.5kw-4p

15kw-4p


×
seo seo